Concrete Calculator

Order the right concrete, the first time.

Interactive Tool
Live Calculation

Concrete Calculator

Volume (cu yd) = Length x Width x Thickness / 27

ft
ft
ft
ft
in
in
Evaluated Formula:Volume (cu yd) = Length x Width x Thickness / 27
Guidance:
A 60 lb bag yields about 0.017 cu yd; an 80 lb bag about 0.022 cu yd.
Order 5-10% extra to account for uneven ground and spillage.
Volume Needed
0.99 cu yd

Calculated instantly

60 lb Bags58.1 bags
80 lb Bags44.89 bags

Embed this calculator

Put this calculator on your own site with the snippet below. The frame contains the tool only, reports its own height, and carries a visible link back to the full page. Embedding is free; keep the attribution link as it is, and do not wrap the frame in a way that hides it.

Preparing the embed code for this page...

What This Calculator Does

The Concrete Calculator estimates the concrete needed for a slab in cubic yards and the number of pre-mixed bags required. It prevents both under-ordering mid-pour and over-ordering that wastes money.

How It Works

The slab volume in cubic feet is length times width times thickness in inches divided by 12. Dividing by 27 converts to cubic yards, then bag counts follow from each bag size yield.

Example

A 10 x 8 foot slab at 4 inches thick needs 10 x 8 x 0.333 / 27 = 0.99 cubic yards, or about 58 sixty-pound bags.

Formula

Slab Volume
Volume (cu yd) = L × W × (Thickness in / 12) / 27
Bag Count
Bags = Volume / Yield per Bag

60 lb ≈ 0.017 cu yd, 80 lb ≈ 0.022 cu yd.

Reading the Results

Volume Needed

The concrete volume for your slab in cubic yards, the unit used when ordering a delivery.

60 lb / 80 lb Bags

How many pre-mixed bags to buy if you are mixing by hand, by bag size.

Frequently Asked Questions

How much concrete do I need for a slab?

Multiply length by width by thickness in feet and divide by 27 for cubic yards. The calculator automates this and reports bag counts.

How many bags of concrete are in a cubic yard?

Roughly 59 sixty-pound bags or 45 eighty-pound bags per cubic yard, accounting for standard yields.

Should I order extra concrete?

Order 5-10% extra. Slight over-excavation and spillage are common, and running short mid-pour is far worse than having a little left.